Design, engineering, fabrication, and commissioning of H2S Scavenger Skid Package for United Energy Pakistan Limited's gas processing operations.
The Challenge
UEPL required a complete H2S Scavenger Skid Package to remove hydrogen sulfide from produced gas meeting pipeline specifications. The project demanded compact design for field installation, reliable operation in sour service conditions, and compliance with NACE MR0175 requirements for sour gas applications.
Project Snapshot
- Client
- United Energy Pakistan Limited (UEPL)
- Location
- Rajani Field, Sindh, Pakistan
- Industry
- Oil & Gas
- Year
- 2020
Our Solution
IESPK delivered turnkey H2S scavenger solution: Complete process design for H2S removal efficiency; Skid-mounted package for rapid deployment; NACE-compliant materials for sour service; Integrated instrumentation and control system; Factory testing and field commissioning support. Package designed for 24/7 unattended operation.
Scope of Work
Technologies Applied
Products Used
The Outcome
Key Deliverables
Complete H2S scavenger skid
Process design package
FAT documentation
Commissioning report
Related Topics
Explore Related Solutions
Learn more about the technologies and services used in this project
Related Content
More resources based on this project's topics
More Case Studies
Related Articles
Have a Similar Challenge?
Let's discuss how we can deliver results for your industrial project
More Case Studies
Oil & GasMPCL GTH Greenfield Gas Processing Facility - Complete E&I Infrastructure
Turnkey electrical and instrumentation infrastructure for Pakistan's 2nd largest E&P company's greenfield Low BTU Gas processing facility from Goru-B, Tipu and HRL reservoirs.
Oil & GasOGDCL Mini LPG Plant Fimkassar - E&I Installation & Commissioning
Complete electrical and instrumentation installation, testing, and commissioning services for OGDCL's Mini LPG Plant at Fimkassar including LT cable laying and field terminations.
Oil & GasOGDCL Kunnar Field Revamping - Instrumentation & Electrical Upgrades
Complete E&I revamping project for OGDCL's Kunnar field including instrument calibration, control valve maintenance, and electrical system upgrades for enhanced production reliability.