IES - Integrated Engineering Services
IESIntegrated Engineering
Cement Manufacturing Plant Aerial View
Industry Case Studies

Cement Industry Projects

Delivering turnkey E&I solutions that enhance operational efficiency, ensure safety compliance, and optimize production across Pakistan's leading cement manufacturers.

25+
Years Experience
15+
Cement Projects
100%
On-Time Delivery
24/7
Support Available
Saadi Cement Plant - E&I Installation
Khyber Pakhtunkhwa, Pakistan
Completed
PROJECT 01Completed

Saadi Cement

Complete Electrical & Instrumentation scope for one of Pakistan's emerging cement manufacturers. This turnkey project encompassed power distribution, automation systems, and safety instrumentation across multiple production zones.

Turnkey E&IPower DistributionAutomationTransformers

Challenge

  • Complex multi-zone facility requiring coordinated E&I integration across crushing, sampling, and stacking operations
  • High-capacity power distribution needs with multiple transformer ratings
  • Hazardous area requirements for fuel oil handling systems
  • Tight project timeline with minimal production disruption

Solution

  • Turnkey E&I implementation with phased execution minimizing downtime
  • Multi-tier transformer installation (1600/630/250 KVA) with redundancy
  • Explosion-proof instrumentation for hazardous zones
  • Complete MCC panels, distribution boards, and cable infrastructure

Outcome

  • Seamless power distribution across all production zones
  • 100% compliance with IEC standards and PEC regulations
  • Zero safety incidents during installation and commissioning
  • Full documentation and operator training delivered

Scope of Work

Crushing & Sampling

Motor control centers, vibration monitoring, conveyor instrumentation

Stacker Systems

Positioning controls, material tracking, automated blending

Grid Station

HT switchgear, protection relays, metering systems

Fuel Oil Area

Tank gauging, pump controls, safety interlocks

Transformers Installed

1600 KVA
630 KVA
250 KVA

Panel Installations

6.3 KV Isolating Switch Cubicle
0.4 KV General Distribution Board
0.4 KV MCC Board

Cable Infrastructure

HT Cable Laying & Termination
LT Cable Laying & Termination
Cable Tray & Conduit Systems
Cherat Cement Plant - Fire & Gas Systems
Nowshera, KPK, Pakistan
Completed
PROJECT 02Completed

Cherat Cement

End-to-end Fire & Gas detection system implementation for enhanced plant safety. This critical safety project included materials supply, instrumentation, complete cabling infrastructure, installation, commissioning, testing, and NIST-traceable calibration services.

Fire & GasSafety SystemsCommissioningCalibration

Challenge

  • High-risk environment requiring comprehensive fire and gas detection coverage
  • Dusty, high-temperature conditions demanding robust equipment
  • Strict regulatory compliance requirements for safety systems
  • Integration with existing plant control systems

Solution

  • Complete F&G system with industrial-grade detectors and controllers
  • SIL-rated instruments for safety-critical applications
  • Full cabling infrastructure with fire-resistant cables
  • Comprehensive commissioning, testing, and NIST-traceable calibration

Outcome

  • Complete plant coverage with rapid detection response times
  • Full compliance with international safety standards
  • Reduced insurance premiums through certified safety systems
  • Enhanced worker safety and regulatory compliance

Project Deliverables

Materials Supply

All F&G system components, detectors, and controllers

Cabling Works

Fire-resistant cables, trays, junction boxes

Installation

Complete field installation by certified technicians

Commissioning

System integration and startup procedures

Testing

Comprehensive functional and loop testing

Calibration

NIST-traceable calibration with certificates

Why Choose IESPK for Cement Projects

Three decades of proven expertise in Pakistan's cement industry

Industry Expertise

25+ years specializing in cement plant E&I and automation systems

Certified Team

PEC-registered engineers with cement industry specialization

On-Time Delivery

100% track record of completing projects within schedule

Safety First

Zero incident record across all cement industry projects

Ready to Discuss Your Cement Project?

Let our experts help you achieve operational excellence with tailored E&I solutions.