IES - Integrated Engineering Services
IESIntegrated Engineering
Engineering Consultancy and System Integration Projects
Industry Case Studies

Engineering Projects

Delivering specialized engineering consultancy, system integration, and field engineering services in collaboration with global technology leaders and Pakistan's leading industrial conglomerates.

30+
Years Experience
50+
Engineering Projects
15+
Global Partners
100%
Client Satisfaction
Industry Overview

Engineering Excellence

IESPK collaborates with global technology leaders including Siemens, HMC, and Descon to deliver world-class engineering solutions. Our joint ventures and partnerships enable us to execute complex projects requiring specialized expertise and international standards compliance.

System Integration

Complete instrumentation & control systems

Field Engineering

On-site technical support & services

Wellhead Systems

Control panels & safety systems

Process Control

Valves, actuators & pneumatic systems

HMC - OGDCL NASHPA Field Instrumentation
NASHPA, KPK
Completed
PROJECT 01Completed

Heavy Mechanical Complex (HMC)

OGDCL NASHPA Field - Joint Venture

To boost OGDCL's new field at NASHPA, IES joined hands with Heavy Mechanical Complex (HMC) for supply and installation of comprehensive instrumentation systems. This strategic partnership delivered advanced field instrumentation for critical three-phase separator systems.

3-Phase SeparatorsHigh Pressure SystemsField InstrumentationJoint Venture

Challenge

  • New greenfield oil & gas field requiring complete instrumentation
  • Multiple separator systems operating at different pressures
  • Remote location with challenging logistics
  • Stringent safety standards for hazardous area operations

Solution

  • Joint venture with HMC for combined engineering expertise
  • Complete instrumentation for HP, MP, and LP separators
  • Material supply, cabling, and termination services
  • Field and control room installation with commissioning

Outcome

  • Successful commissioning of all separator systems
  • Enhanced production capability at NASHPA field
  • Strengthened IES-HMC partnership for future projects
  • Zero safety incidents during execution

Scope of Work

HP Separator

High Pressure 3-Phase Separator instrumentation

MP Separator

Medium Pressure 3-Phase Separator systems

LP Separator

Low Pressure 3-Phase Separator instrumentation

Commissioning

Field & Control Room installation & commissioning

PROJECT 02Completed

Siemens Pakistan

PPL Adhi Gas Field - Field Engineering

IES provided specialized services on behalf of Siemens for installation and commissioning of wellhead control panels at Pakistan Petroleum Limited's Adhi Gas Field. This partnership demonstrated our capability to execute projects meeting international standards and Siemens' quality requirements.

Wellhead Control PanelsField EngineeringSiemens PartnershipPPL Project
Siemens Pakistan - PPL Adhi Gas Field Wellhead Control Panels
Adhi, Punjab
2009

Challenge

  • High-profile project requiring Siemens-standard execution
  • Critical wellhead safety systems requiring precision
  • Active gas field operations with minimal downtime tolerance
  • International quality and documentation requirements

Solution

  • Dedicated field engineering team representing Siemens
  • Professional installation of wellhead control panels
  • Comprehensive commissioning and testing procedures
  • Full documentation per Siemens quality standards

Outcome

  • Successful commissioning meeting Siemens standards
  • Enhanced wellhead safety and control systems
  • Established IES as approved Siemens service provider
  • Zero incidents during installation and commissioning

Project Deliverables

Wellhead Control Panels

Installation and configuration of control panels

Field Engineering

On-site technical support and supervision

Commissioning Services

Complete testing and commissioning

Documentation

As-built drawings and test reports

Training

Operator training on panel operations

Handover

Complete project handover to PPL

Descon - UEPL Rajani Field Control Valves and Pneumatic Systems
Rajani, Sindh
2009
PROJECT 03Completed

Descon Engineering

UEPL Rajani Field - Process Control

To operate Slug Catcher and Blowcase vessels for water decanting and gas production at UEPL Rajani Field, IES supplied critical process control equipment to Descon including control valves, shutdown valves, and complete pneumatic panel systems for safe and efficient operations.

Control ValvesShutdown ValvesPneumatic PanelsSlug Catcher

Challenge

  • Critical process vessels requiring precise control
  • High-pressure gas and water separation operations
  • Safety-critical shutdown valve requirements
  • Remote field location with logistical challenges

Solution

  • Supply of precision control valves for flow regulation
  • Safety-certified shutdown valves for emergency isolation
  • Complete pneumatic panel for valve actuation
  • Technical support for installation and commissioning

Outcome

  • Reliable operation of Slug Catcher system
  • Efficient water decanting and gas production
  • Enhanced safety with proper shutdown systems
  • Strengthened IES-Descon partnership

Equipment Supplied

Control Valves

Precision flow control valves for process regulation

Shutdown Valves

Safety-certified emergency isolation valves

Pneumatic Panel

Complete pneumatic control and actuation system

Our Advantage

Why Choose IESPK for Engineering Projects

Global Partnerships

Collaborations with Siemens, HMC, Descon, and leading technology providers

Proven Track Record

30+ years of successful engineering projects across Pakistan

Safety Excellence

Zero-incident record on hazardous area installations

Technical Expertise

Specialized skills in field instrumentation and control systems

Ready to Partner with Us?

Let's discuss how IESPK can support your engineering project with our technical expertise and global partnerships.