Supply and installation of Mosaic Panels, Sequence of Event Recorder systems, and Operating Consoles for Karachi Electric's power generation facilities.
The Challenge
Karachi Electric required modernization of their control room infrastructure including legacy mosaic panels replacement, implementation of sequence of event recording for disturbance analysis, and ergonomic operator console upgrades for improved situational awareness.
Project Snapshot
- Client
- K-Electric Limited
- Location
- Karachi, Pakistan
- Industry
- Power Plant
- Year
- 2018
Our Solution
IESPK delivered comprehensive control room solutions: Custom-designed mosaic panels replicating plant systems; High-resolution Sequence of Event Recorder (SoER) capturing events to millisecond accuracy; Ergonomic operator consoles with integrated displays; Complete integration with existing SCADA systems. All equipment designed for 24/7 power plant operations.
Scope of Work
Technologies Applied
Products Used
The Outcome
Key Deliverables
Custom mosaic panels
Sequence of Event Recorder
Operator consoles
Integration documentation
Related Topics
Explore Related Solutions
Learn more about the technologies and services used in this project
Related Content
More resources based on this project's topics
More Case Studies
Related Articles
Have a Similar Challenge?
Let's discuss how we can deliver results for your industrial project
More Case Studies
Oil & GasMPCL GTH Greenfield Gas Processing Facility - Complete E&I Infrastructure
Turnkey electrical and instrumentation infrastructure for Pakistan's 2nd largest E&P company's greenfield Low BTU Gas processing facility from Goru-B, Tipu and HRL reservoirs.
Oil & GasOGDCL Mini LPG Plant Fimkassar - E&I Installation & Commissioning
Complete electrical and instrumentation installation, testing, and commissioning services for OGDCL's Mini LPG Plant at Fimkassar including LT cable laying and field terminations.
Oil & GasOGDCL Kunnar Field Revamping - Instrumentation & Electrical Upgrades
Complete E&I revamping project for OGDCL's Kunnar field including instrument calibration, control valve maintenance, and electrical system upgrades for enhanced production reliability.